Projects

Mining and processing integrated plant “Oleniy Ruchey”

Горно-обогатительный комбинат «Олений ручей»

Client: "СЗФК"

Address: The mining and processing complex “Oleniy Ruchey” is located in the Murmansk Region

Services: Implementation of designer supervision in the apatite-nepheline ore deposit “Oleniy Ruchey”

The adjustment of the design of 2008 year was implemented. It allowed improving ecological efficiency of Oleniy Ruchey apatite-nepheline ore deposit development.

New design optimized opening scheme, excluded blind shaft, reduced opening paces, which allowed reaching maximum concentration of mine operations.

Technical solutions that had been accepted, allowed to commence fast ore mining and to bring the mine to design capacity, with redistribution of capital investments into mine construction for a longer period with its assimilation as ore stock of deeper levels are entering.

Back to list

Clients
"Полюс" "ЕВРАЗ" ГК "Русская платина" "Стойленский ГОК" "Комбинат КМАруда" "Сибирь-Полиметаллы" ГМК "Норильский никель" "СЗФК" "Русская медная компания" УК «Золотые проекты»
Projects
Наталкинское месторождение

Natalka deposit

Gold ore deposit

Mining and Processing Works with 40 MTPA Throughput Based on Natalkinskoye Gold Field.

Качканарский ГОК. Месторождение «Собственно-Качканарское»

Kachkanarsky GOK (Kachkanarsky Mining and Processing Integrated Plant). Sobstvenno-Kachkanarskoe deposit

Different variants of ore stripping and transportation to existing process plant have been developed. Cutting edge technologies were used that allowed «fitting» new mining and transportation scheme into existing construction site at minimum expense.

All projects